Grey Structure & Turnkey BOQ Estimator

Construction Cost Calculator

Calculate itemized Grey Structure and Turnkey finishing costs for residential builds across 5 Marla, 10 Marla, 1 Kanal, 2 Kanal, or custom covered areas.

Live Material & Civil Engineering Rates (Cement • 60-G Steel • Bricks • MEP • Finishing)

Grey & Turnkey Bill of Quantities (BOQ) Breakdown

Total Estimated Construction Cost (5,600 Sq.Ft. × PKR 8,400/Sq.Ft.)
PKR 4.70 Crore
Cement (16%)PKR 75.26 LakhOPC Grade-53 Structural
60-G Steel (22%)PKR 1.03 CroreDeformed Rebar ASTM A615
Bricks & Crush (18%)PKR 84.67 LakhAwwal Bricks, Ravi/Chenab Sand & Margalla
MEP Works (17%)PKR 79.97 LakhPPRC Plumbing, Copper Wiring & Conduits
Finishing & Labor (27%)PKR 1.27 CroreTiles, Woodwork, Paint, Glass & Skilled Labor
Note: BOQ estimates reflect standard Lahore residential soil bearing conditions and current market material rates. Soil testing, basement retaining walls, and solar packages are quoted per architectural drawing.